News


February 10, 2025
Institute TOMS took part in the international scientific symposium Miner’s Week 2025, February 3-7

Institute TOMS took part in the international scientific symposium Miner’s Week 2025 held by MISIS University, February 3–7. The specialists of Mining audit and consulting department delivered a report on advanced approaches to create geometallurgical block models and assess process variability of ores.

December 23, 2024
Successful trials of a new laboratory flotation cell

In December 2024, Institute TOMS jointly with specialists of Tufekcioglu company and Sever Minerals JSC successfully carried out trials of a new advanced lab-scale flotation cell with computer-aided process control – TK LabFroth by Tufekcioglu.

October 14, 2024
Institute TOMS – one of the key sponsors of the 20th MINEX Mining and Exploration Forum, Moscow, 202

Institute TOMS acted as one of the key sponsors of the 20th MINEX Mining and Exploration Forum that took place in Moscow on 9-10 October, 2024. The event was held under the slogan “People. Technologies. Mineral Resources”

August 12, 2024
A multi day sail crossing of Lake Baikal flying the flag of Institute TOMS

This year TOMS team has crossed the world’s deepest lake Baikal on a swift-sailing yacht

July 22, 2024
Visit to the construction site of the copper plant MOF-3 of Almalyk Mining and Metallurgical Complex

TOMS specialists have visited the construction site of the copper plant MOF-3 of Almalyk Mining and Metallurgical Complex (Uzbekistan). The construction has been implemented within an investment project “Development of Yoshlik I deposit”. The deposit is rich in such valuable metals as gold, copper, silver, and molybdenum

Main page/Testworks/Process design basis

Process design basis

Institute TOMS has prepared Process Design Basis documents containing information about the development of a process for more than 20 years.
Process Design Basis document includes the following:

  • Ore description;
  • Metallurgical balance;
  • Material balance;
  • Environmental impact assessment;
  • Electric energy supply;
  • Design criteria;
  • Mineral processing
  • Metallurgy
  • Reagents
  • Tailings
  • Water supply
  • Filtration and drying.

The Process Design Basis is used throughout all design stages (scoping study, feasibility study, basic engineering and detailed design) as a primary written source of information for the engineers carrying out the design work, and as a basic document for further work. Institute TOMS has developed Process Desing Basis documents for design of ore processing and metallurgical plants dealing with recovery of gold, silver, copper, iron, carbon, tungsten, molybdenum, tantalum, niobium, zinc, lead, and other valuable components. Major part of these processes is successfully implemented in mining industry.​

 

Reference list for testworks

В вашем браузере отключена поддержка Jasvscript. Работа в таком режиме затруднительна.
Пожалуйста, включите в браузере режим "Javascript - разрешено"!
Если Вы не знаете как это сделать, обратитесь к системному администратору.
Вы используете устаревшую версию браузера.
Отображение страниц сайта с этим браузером проблематична.
Пожалуйста, обновите версию браузера!
Если Вы не знаете как это сделать, обратитесь к системному администратору.