Institute TOMS became a title sponsor of the International Conference “Plaksin Readings – 2023” which was held in Moscow on October 2nd – 5th.
September 11, 2023, the President of Russian Federation, Vladimir Putin, took part in launching two landmark mining projects. They are Stage II of the gold plant within Pavlik mining and processing complex, and the concentrator plant of Udokan mining and metallurgical complex. Both projects were implemented on the basis of the process solutions developed by Institute TOMS.
In December 2022 Institute TOMS successfully proved its expertise for compliance with requirements GOST ISO/IEC 17025-2019 “General requirements for the competence of testing and calibration laboratories”
Reference list for design works
Institute TOMS has developed design documentation at all stages and for all sections from FS to detailed design.
Ore type | Design works for plants at deposits |
Gold ores | Alexandrovskoye, Badran, Belaya Gora, Bogolyubovskoye, Chashinskoye, Gaiskoye, Karalveem, Kedrovskoye, Klen, Konevinskoye, Natalkinskoye, Nevskoye, Nerundinskoye, Osinovoye, Ozernovskoye, Paramangi, Pavlik, RudKaralon, Ryabinovoye, Sukhoi Log (Zapadnoye), Tardan, Vasilievskoe, Vyun |
Polymetallic ores | Bystrinskoye, Kalmakyr, Novo-Shirokinskoye, Ozernoye |
Copper and copper-moly ores | Zhairem, Nurkazgan, Tominskoye, Uchalinskoye, Udokanskoye, Yoshlik |
Iron ores | Kovdorskoye, Mikhailovskoye |
Potassium ores | Gremyachinskoye, Verkhnekamskoye |
Molybdenum ores | Bugdainskoye |
Tungsten ores | Dzhida |
Tin ores | Syrymbet |