TOMS specialists have visited the construction site of the copper plant MOF-3 of Almalyk Mining and Metallurgical Complex (Uzbekistan). The construction has been implemented within an investment project “Development of Yoshlik I deposit”. The deposit is rich in such valuable metals as gold, copper, silver, and molybdenum
Testworks
News
TOMS specialists have visited the construction site of the copper plant MOF-3 of Almalyk Mining and Metallurgical Complex (Uzbekistan). The construction has been implemented within an investment project “Development of Yoshlik I deposit”. The deposit is rich in such valuable metals as gold, copper, silver, and molybdenum
Institute TOMS became a title sponsor of the International Conference “Plaksin Readings – 2023” which was held in Moscow on October 2nd – 5th.
September 11, 2023, the President of Russian Federation, Vladimir Putin, took part in launching two landmark mining projects. They are Stage II of the gold plant within Pavlik mining and processing complex, and the concentrator plant of Udokan mining and metallurgical complex. Both projects were implemented on the basis of the process solutions developed by Institute TOMS.
In December 2022 Institute TOMS successfully proved its expertise for compliance with requirements GOST ISO/IEC 17025-2019 “General requirements for the competence of testing and calibration laboratories”
Udokan Copper company addressed a Letter of Appreciation to Institute TOMS to thank them for proper and timely completion of the complex pre-design and design works
Through 2020 to 2022 within the framework of five separate contracts Institute TOMS successfully completed design works for Bystrinskoye mining company (GRK Bystrinskoye)