News


October 06, 2023
Institute TOMS took part in an annual contest “Russian Mining Award”

Institute TOMS took part in an annual contest “Russian Mining Award” which is informally called “Mining Oscar”. The contest is aimed at an independent evaluation and promotion of the best achievements in various fields of mining and processing industry.

October 06, 2023
Institute TOMS participated in the 19th Mining Forum MINEX Russia 2023 held in Moscow

In October 2023, Institute TOMS participated in the 19th Mining Forum MINEX Russia 2023 held in Moscow

October 05, 2023
Institute TOMS became a title sponsor of the International Conference “Plaksin Readings – 2023”

Institute TOMS became a title sponsor of the International Conference “Plaksin Readings – 2023” which was held in Moscow on October 2nd – 5th.

September 12, 2023
Startup of Stage II of the Pavlik gold plant and the Udokan concentrator plant

September 11, 2023, the President of Russian Federation, Vladimir Putin, took part in launching two landmark mining projects. They are Stage II of the gold plant within Pavlik mining and processing complex, and the concentrator plant of Udokan mining and metallurgical complex. Both projects were implemented on the basis of the process solutions developed by Institute TOMS.

January 09, 2023
Successful accreditation of the analytical laboratoty

In December 2022 Institute TOMS successfully proved its expertise for compliance with requirements GOST ISO/IEC 17025-2019 “General requirements for the competence of testing and calibration laboratories”

Main page/Plants

Plants

​​​​​​​​​​​

Gold processing plant at Aleksandrovskoye deposit, Trans-Baikal Territory, 0.75 Mtpa, 2013
Gold processing plant at Ametistovoye deposit, Kamchatka Territory, 0.6 Mtpa, 2015
Alluvial gold processing plant, Trans-Baikal Territory, 1999
Modular gold plant at Badran deposit, Republic of Sakha (Yakutia), 2001

Gold processing plant of 0.8 Mtpa at Zapadnoye deposit, Irkutsk region, 2005
Grinding section of gold processing plant at Zapadnoye deposit, Irkutsk Region, 2005
Modular gold plant at At-Uryakh deposit, Magadan Region, 2007
Copper processing plant of 4 Mtpa at Nurkazgan deposit, Kazakhstan, 2007

Copper processing plant of 4 Mtpa at Nurkazgan deposit, Kazakhstan, 2007 Crushing in HPGR, ball grinding, flotation
Gold processing plant at Tardan deposit, Republic of Tuva, 2005
Gold processing plant of 1.5 Mtpa at Belaya Gora deposit, Khabarovsk Territory, 2013 Grinding section (SAG-BM)
Modular gold plant at Kedrovskoye deposit, Republic of Buryatia, 1997

Gold processing plant of 1.5 Mtpa at Belaya Gora deposit, Khabarovsk Territory, 2013 Ball grinding, classification
Dzhida tungsten&molybdenum processing plant, Republic of Buryatia, 2008
Modular gold plant at Badran deposit, Republic of Sakha (Yakutia), 2001 Ball grinding in rubber roller mills, three-stage centrifugal separation
Modular gold plant at Shkolnoye deposit, Magadan Region, 1997 Ball grinding, fine screening, two-stage centrifugal separation

Gold processing plant of 8 Mtpa at Vasilkovskoye / Altyntau deposit, Kazakhstan, 2009 HPGR - BM - Gravity - Flotation - UFG - Leachox - CIL
Gold processing plant at Vasilkovskoye / Altyntau deposit, Kazakhstan HPGR
Gold processing plant at Vasilkovskoye / Altyntau deposit, Kazakhstan Classification
Gold processing plant at Vasilkovskoye / Altyntau deposit, Kazakhstan Flotation section

В вашем браузере отключена поддержка Jasvscript. Работа в таком режиме затруднительна.
Пожалуйста, включите в браузере режим "Javascript - разрешено"!
Если Вы не знаете как это сделать, обратитесь к системному администратору.
Вы используете устаревшую версию браузера.
Отображение страниц сайта с этим браузером проблематична.
Пожалуйста, обновите версию браузера!
Если Вы не знаете как это сделать, обратитесь к системному администратору.