News


June 26, 2020
JK Drop Weight / SMC Test Accreditation

On the 12th of May 2020, Institute TOMS received an official confirmation from JK Tech Pty that the testwork quality and the personnel competencies are in conformity with high international standards.

June 16, 2020
A new up-to-date laser particle size analyzer Malvern Mastersizer was installed and put into operation in Institute TOMS

In June 2020, a new up-to-date laser particle size analyzer Malvern Mastersizer was installed and put into operation in Institute TOMS.

April 30, 2020
Professional exchange and ongoing cooperation between TOMS and KÖPPERN in the field of iron ore concentrate re-grinding

In March 2020, engineers of Institute Toms and Köppern met in Irkutsk to exchange about the challenges in iron ore concentrate re-grinding with HPGR and to perform a collaborative test work series on iron ore concentrate.

March 16, 2020
Positive conclusion from the State Reserves Commission

The State Reserves Commission delivered its positive conclusion after consideration of the Report developed by Institute TOMS for Ozernovskoye Project

January 31, 2020
Institute TOMS acquired and put into commission a modern inductively coupled plasma optical emission spectrometer

Institute TOMS acquired and put into commission a modern inductively coupled plasma optical emission spectrometer (ICP-OES) Agilent with dual plasma view

Main page/Plants

Plants

​​​​​​​​​​​

Gold processing plant at Aleksandrovskoye deposit, Trans-Baikal Territory, 0.75 Mtpa, 2013
Gold processing plant at Ametistovoye deposit, Kamchatka Territory, 0.6 Mtpa, 2015
Alluvial gold processing plant, Trans-Baikal Territory, 1999
Modular gold plant at Badran deposit, Republic of Sakha (Yakutia), 2001

Gold processing plant of 0.8 Mtpa at Zapadnoye deposit, Irkutsk region, 2005
Grinding section of gold processing plant at Zapadnoye deposit, Irkutsk Region, 2005
Modular gold plant at At-Uryakh deposit, Magadan Region, 2007
Copper processing plant of 4 Mtpa at Nurkazgan deposit, Kazakhstan, 2007

Copper processing plant of 4 Mtpa at Nurkazgan deposit, Kazakhstan, 2007 Crushing in HPGR, ball grinding, flotation
Gold processing plant at Tardan deposit, Republic of Tuva, 2005
Gold processing plant of 1.5 Mtpa at Belaya Gora deposit, Khabarovsk Territory, 2013 Grinding section (SAG-BM)
Modular gold plant at Kedrovskoye deposit, Republic of Buryatia, 1997

Gold processing plant of 1.5 Mtpa at Belaya Gora deposit, Khabarovsk Territory, 2013 Ball grinding, classification
Dzhida tungsten&molybdenum processing plant, Republic of Buryatia, 2008
Modular gold plant at Badran deposit, Republic of Sakha (Yakutia), 2001 Ball grinding in rubber roller mills, three-stage centrifugal separation
Modular gold plant at Shkolnoye deposit, Magadan Region, 1997 Ball grinding, fine screening, two-stage centrifugal separation

Gold processing plant of 8 Mtpa at Vasilkovskoye / Altyntau deposit, Kazakhstan, 2009 HPGR - BM - Gravity - Flotation - UFG - Leachox - CIL
Gold processing plant at Vasilkovskoye / Altyntau deposit, Kazakhstan HPGR
Gold processing plant at Vasilkovskoye / Altyntau deposit, Kazakhstan Classification
Gold processing plant at Vasilkovskoye / Altyntau deposit, Kazakhstan Flotation section

В вашем браузере отключена поддержка Jasvscript. Работа в таком режиме затруднительна.
Пожалуйста, включите в браузере режим "Javascript - разрешено"!
Если Вы не знаете как это сделать, обратитесь к системному администратору.
Вы используете устаревшую версию браузера.
Отображение страниц сайта с этим браузером проблематична.
Пожалуйста, обновите версию браузера!
Если Вы не знаете как это сделать, обратитесь к системному администратору.