News


January 09, 2023
Successful accreditation of the analytical laboratoty

In December 2022 Institute TOMS successfully proved its expertise for compliance with requirements GOST ISO/IEC 17025-2019 “General requirements for the competence of testing and calibration laboratories”

December 22, 2022
Letter of Appreciation from Udokan Copper company

Udokan Copper company addressed a Letter of Appreciation to Institute TOMS to thank them for proper and timely completion of the complex pre-design and design works

December 07, 2022
Successful completion of design works for Bystrinskoye mining company

Through 2020 to 2022 within the framework of five separate contracts Institute TOMS successfully completed design works for Bystrinskoye mining company (GRK Bystrinskoye)

November 25, 2022
An official ceremony marking the commissioning of a concentrate beneficiation facility

An official ceremony marking the commissioning of a concentrate beneficiation facility took place on the 17th of November 2022 at the Andrey Varichev Mikhailovsky GOK (Metalloinvest). Construction of the new beneficiation facility was fulfilled based on the process design criteria and engineering design developed by Institute TOMS.

November 22, 2022
Positive appraisal report for the project “Lebedinsky GOK, JSC. Processing plant. Flotation Complex”

In November 2022, a positive appraisal report of the Federal autonomous institution “Main Department of State Expertise” was received for the project “Lebedinsky GOK, JSC. Processing plant. Flotation Complex”

Main page/Plants

Plants

​​​​​​​​​​​

Gold processing plant at Aleksandrovskoye deposit, Trans-Baikal Territory, 0.75 Mtpa, 2013
Gold processing plant at Ametistovoye deposit, Kamchatka Territory, 0.6 Mtpa, 2015
Alluvial gold processing plant, Trans-Baikal Territory, 1999
Modular gold plant at Badran deposit, Republic of Sakha (Yakutia), 2001

Gold processing plant of 0.8 Mtpa at Zapadnoye deposit, Irkutsk region, 2005
Grinding section of gold processing plant at Zapadnoye deposit, Irkutsk Region, 2005
Modular gold plant at At-Uryakh deposit, Magadan Region, 2007
Copper processing plant of 4 Mtpa at Nurkazgan deposit, Kazakhstan, 2007

Copper processing plant of 4 Mtpa at Nurkazgan deposit, Kazakhstan, 2007 Crushing in HPGR, ball grinding, flotation
Gold processing plant at Tardan deposit, Republic of Tuva, 2005
Gold processing plant of 1.5 Mtpa at Belaya Gora deposit, Khabarovsk Territory, 2013 Grinding section (SAG-BM)
Modular gold plant at Kedrovskoye deposit, Republic of Buryatia, 1997

Gold processing plant of 1.5 Mtpa at Belaya Gora deposit, Khabarovsk Territory, 2013 Ball grinding, classification
Dzhida tungsten&molybdenum processing plant, Republic of Buryatia, 2008
Modular gold plant at Badran deposit, Republic of Sakha (Yakutia), 2001 Ball grinding in rubber roller mills, three-stage centrifugal separation
Modular gold plant at Shkolnoye deposit, Magadan Region, 1997 Ball grinding, fine screening, two-stage centrifugal separation

Gold processing plant of 8 Mtpa at Vasilkovskoye / Altyntau deposit, Kazakhstan, 2009 HPGR - BM - Gravity - Flotation - UFG - Leachox - CIL
Gold processing plant at Vasilkovskoye / Altyntau deposit, Kazakhstan HPGR
Gold processing plant at Vasilkovskoye / Altyntau deposit, Kazakhstan Classification
Gold processing plant at Vasilkovskoye / Altyntau deposit, Kazakhstan Flotation section

В вашем браузере отключена поддержка Jasvscript. Работа в таком режиме затруднительна.
Пожалуйста, включите в браузере режим "Javascript - разрешено"!
Если Вы не знаете как это сделать, обратитесь к системному администратору.
Вы используете устаревшую версию браузера.
Отображение страниц сайта с этим браузером проблематична.
Пожалуйста, обновите версию браузера!
Если Вы не знаете как это сделать, обратитесь к системному администратору.