In December 2022 Institute TOMS successfully proved its expertise for compliance with requirements GOST ISO/IEC 17025-2019 “General requirements for the competence of testing and calibration laboratories”
Udokan Copper company addressed a Letter of Appreciation to Institute TOMS to thank them for proper and timely completion of the complex pre-design and design works
Through 2020 to 2022 within the framework of five separate contracts Institute TOMS successfully completed design works for Bystrinskoye mining company (GRK Bystrinskoye)
An official ceremony marking the commissioning of a concentrate beneficiation facility took place on the 17th of November 2022 at the Andrey Varichev Mikhailovsky GOK (Metalloinvest). Construction of the new beneficiation facility was fulfilled based on the process design criteria and engineering design developed by Institute TOMS.
In November 2022, a positive appraisal report of the Federal autonomous institution “Main Department of State Expertise” was received for the project “Lebedinsky GOK, JSC. Processing plant. Flotation Complex”
News
The State Reserves Commission delivered its positive conclusion after consideration of the Report developed by Institute TOMS
In March 2020, the State Reserves Commission delivered its positive conclusion after consideration of the Report with an estimate of gold reserves at Ozernovskoye deposit in the Kamchatka Territory as on 01.01.2019 developed by Institute TOMS. Ozernovskoye deposit is explored and ready for commercial exploitation.