TOMS specialists have visited the construction site of the copper plant MOF-3 of Almalyk Mining and Metallurgical Complex (Uzbekistan). The construction has been implemented within an investment project “Development of Yoshlik I deposit”. The deposit is rich in such valuable metals as gold, copper, silver, and molybdenum
News
JK Drop Weight / SMC Test Accreditation
Institute TOMS has routinely participated in JK Round Robin Testing. So it was in 2019-2020 when the testing involved 37 international research centres and consulting companies to estimate the quality of JK DWT/SMC tests performance.
On the 12th of May 2020, Institute TOMS received an official confirmation from JK Tech Pty that the testwork quality and the personnel competencies are in conformity with high international standards.
JK Drop Weight testing is designated to determine ore specific parameters which are then interpreted using JKSimMet Mineral Processing Simulator. JKSimMet package covers all relevant tasks related to analysis, optimization, design and simulation of data as well as storage and handling of models, data, and results.
The Institute’s TOMS specialists are trained and accredited to work with the JKSimMet soft package, which allows us to execute the whole scope of works starting from ore testing and finishing with flowsheets simulation for new plants or modernization for existing ones.
Institute TOMS has already worked in this sphere for a long stretch of time and we always prove our high professional competence properly performing all procedures and ensuring the results.