Institute TOMS became a title sponsor of the International Conference “Plaksin Readings – 2023” which was held in Moscow on October 2nd – 5th.
September 11, 2023, the President of Russian Federation, Vladimir Putin, took part in launching two landmark mining projects. They are Stage II of the gold plant within Pavlik mining and processing complex, and the concentrator plant of Udokan mining and metallurgical complex. Both projects were implemented on the basis of the process solutions developed by Institute TOMS.
In December 2022 Institute TOMS successfully proved its expertise for compliance with requirements GOST ISO/IEC 17025-2019 “General requirements for the competence of testing and calibration laboratories”
News
The Central Commission of Federal Agency for Mineral Resources on development of solid mineral deposits gave its approval to the design documentation for Udokan project
The Central Commission of Federal Agency for Mineral Resources (Rosnedra) on development of solid mineral deposits gave its approval to the design documentation “Technical design for primary processing of mineral resources (process flowsheet) from Udokan deposit. License No. ЧИТ 14956 ТЭ” developed by Institute TOMS. The approval was registered in Minutes No. 152/19-стп of the meeting held by the Rosnedra Central Commission in August 13, 2019.
Udokan deposit is the largest deposit in Russia and the third largest untapped in the world in terms of copper reserves (about 24.6 Mt). Complications of the deposit development are related mostly with its location in the permafrost zone and earthquake-prone region.